Customer crushing to 70mm for subbase material.
Mainly old concrete, loaded by hand
With the conveyor attached. Time taken to crush 2x 6yd skip loads. 6 Hours.
Customer laying new path, recycling the old one as sub-base. Machine used
to windrow material as he went, thus no conveyor needed.
Crushing old concrete, on a 40mm Setting.
Crushing time for 1x 4yd skip load. 2.5hours